Sfoglia per Autore  

Opzioni
Mostrati risultati da 1 a 17 di 17
Titolo Data di pubblicazione Autori File
A branch-and-cut algorithm for a production scheduling problem with sequence-dependent and time-dependent setup times 1-gen-2008 STECCO, GABRIELLA +
A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine 1-gen-2009 STECCO, GABRIELLA +
A Risk Assessment Application of a Real Time Decision Support System Model for HAZMAT Transportation in a Sustainable Oriented Motorway Environment 1-gen-2009 STECCO, GABRIELLAUKOVICH, WALTER +
The impact of ICT on an Intermodal Transportation System: an analysis by Petri Nets 1-gen-2009 STECCO, GABRIELLAUKOVICH, WALTER +
Performance Analysis and Management of an Automated Distribution Center 1-gen-2009 IACOBELLIS, GiorgioSTECCO, GABRIELLAUKOVICH, WALTER +

Scheduling the internal operations in distribution centers with buffer constraints 1-gen-2010 STECCO, GABRIELLAUKOVICH, WALTER +
The Impact of ICT on Intermodal Transportation Systems: a Modelling Approach by Petri Nets 1-gen-2010 STECCO, GABRIELLAUKOVICH, WALTER +

Solving scheduling problems in distribution centers using symmetry breaking constraints 1-gen-2011 STECCO, GABRIELLAUKOVICH, WALTER +
Solving Scheduling Problems in Distribution Centers by Mixed Integer Linear Programming Formulations 1-gen-2011 FANTI, MARIA PIASTECCO, GABRIELLAUKOVICH, WALTER
A Mixed Integer Linear Programming Model of a Steelmaking and Casting Plant 1-gen-2013 FANTI, MARIA PIASTECCO, GABRIELLAUKOVICH, WALTER
Production Scheduling in a Steelmaking and Continuous Casting Plant: a Case Study 1-gen-2013 FANTI, MARIA PIAROTUNNO, GIULIANASTECCO, GABRIELLAUKOVICH, WALTER
Scheduling Internal Operations in Post-Distribution Cross Docking Systems 1-gen-2014 FANTI, MARIA PIASTECCO, GABRIELLAUKOVICH, WALTER
Flight path optimization for minimizing emissions and avoiding weather hazard 1-gen-2014 FANTI, MARIA PIAMININEL, STEFANONOLICH, MASSIMILIANOSTECCO, GABRIELLAUKOVICH, WALTERBERNABO', MARCELLOSERAFINO, GABRIELLA
Integrating ICT into Logistics Intermodal Systems: A petri net model of the Trieste port 1-gen-2015 DANIELIS, ROMEOFANTI, MARIA PIAMANGINI, AGOSTINO MARCELLOPESENTI, RaffaeleSTECCO, GABRIELLAUKOVICH, WALTER +
An Integrated System for Production Scheduling in Steelmaking and Casting Plants 1-gen-2016 FANTI, MARIA PIAROTUNNO, GIULIANASTECCO, GABRIELLAUKOVICH, WALTERMININEL, STEFANO
Modelling and solving the multi-day container drayage problem 1-gen-2017 Clemente, Monica.Fanti, M. P.Nolich, M.Stecco, G.Ukovich, W.
Actors interactions and needs in the European electromobility network 1-gen-2017 Fanti, Maria PiaPedroncelli, GiovanniMininel, StefanoStecco, GabriellaUkovich, Walter +
Mostrati risultati da 1 a 17 di 17
Legenda icone

  •  file ad accesso aperto
  •  file disponibili sulla rete interna
  •  file disponibili agli utenti autorizzati
  •  file disponibili solo agli amministratori
  •  file sotto embargo
  •  nessun file disponibile