Aim of the present paper is assessing the technical-economic comparison between three-conductor bundled (3B) and four-conductor bundled (4B) 380 kV overhead transmission lines (OHLs). In both cases, the widely used standard ACSR 31.5 mm is taken as the base conductor. Increasing the number of conductors with respect to the commonly used 3B improves the transport capacity, which can be properly represented in terms of loadability, i.e. the maximum allowable power that can be transmitted for an assigned value of the line length. The consequent higher power limit can be very useful in reducing transmission congestions and, thus, wind-generated energy curtailment that currently is not negligible in Southern Italy, promoting the integration of renewable energy. Moreover, reducing congestions has positive effect in relieving the differences in terms of zonal prices of the electric energy, bringing a further economic benefit for the system. The paper addresses these items performing a technical-economic comparison between a 3B and a 4B 380 kV OHL, assuming basically the same load diagram for both solutions.

Technical-economic comparison between three and four-conductor bundled 380 kV OHLs

QUAIA, STEFANO
2016-01-01

Abstract

Aim of the present paper is assessing the technical-economic comparison between three-conductor bundled (3B) and four-conductor bundled (4B) 380 kV overhead transmission lines (OHLs). In both cases, the widely used standard ACSR 31.5 mm is taken as the base conductor. Increasing the number of conductors with respect to the commonly used 3B improves the transport capacity, which can be properly represented in terms of loadability, i.e. the maximum allowable power that can be transmitted for an assigned value of the line length. The consequent higher power limit can be very useful in reducing transmission congestions and, thus, wind-generated energy curtailment that currently is not negligible in Southern Italy, promoting the integration of renewable energy. Moreover, reducing congestions has positive effect in relieving the differences in terms of zonal prices of the electric energy, bringing a further economic benefit for the system. The paper addresses these items performing a technical-economic comparison between a 3B and a 4B 380 kV OHL, assuming basically the same load diagram for both solutions.
File in questo prodotto:
File Dimensione Formato  
Official Paper EPQ0185.pdf

Accesso chiuso

Descrizione: Articolo principale
Tipologia: Documento in Versione Editoriale
Licenza: Digital Rights Management non definito
Dimensione 170.23 kB
Formato Adobe PDF
170.23 kB Adobe PDF   Visualizza/Apri   Richiedi una copia
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11368/2881569
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact