Sfoglia per Autore
A Hierarchical Approach to Manage the Logistics of an FMS
1997-01-01 Nicolich, Marino; R., Pesenti; P., Persi; Ukovich, Walter
On the Tool Standardisation in an FMS Environment
1997-01-01 Nicolich, Marino; Reini, Mauro; R., Pesenti; Ukovich, Walter
A Hierarchic Approach to Manage the Logistics of an FMS Cell
1997-01-01 Nicolich, Marino; R., Pesenti; Piero, Persi; Ukovich, Walter
Dynamic Routing--and--Inventory Problems: a Review
1998-01-01 Baita, F.; Pesenti, R.; Ukovich, Walter; Favaretto, D.
Feedback control of production-distribution systems with unknown demand and delays
1998-01-01 Blanchini, F.; Pesenti, Raffaele; Rinaldi, F.; Ukovich, Walter
Decentralized control of continuous-time production-distribution systems with unknown inputs
1998-01-01 Blanchini, Miani; Ukovich, Walter
Quantitative models and methods for locating logistic nodes in maritime transportation
1998-01-01 Castelli, Lorenzo; Longo, Giovanni; Pesenti, R.; Ukovich, Walter
A Hierarchic Approach to Production Planning and Scheduling of a Flexible Manufacturing System
1999-01-01 P., Persi; R., Pesenti; Ukovich, Walter; Nicolich, Marino
Models for Flow Management
1999-01-01 Lucertini, M.; Nicolò, F.; Ukovich, Walter; Villa, A.
A DEA-like model for a multi-layer resource allocation problem
1999-01-01 Castelli, Lorenzo; R., Pesenti; Ukovich, Walter
Feedback Control of production-Distribution Systems with Unknown Demand and Delays
2000-01-01 Blanchini, F.; Pesenti, R.; Rinaldi, F.; Ukovich, Walter
A comparison of different solution approaches to the vehicle scheduling problem in a practical case
2000-01-01 Baita, F.; Pesenti, R.; Ukovich, Walter; Favaretto, D.
Exact and Heuristic Solutions for a ShipmentProblem with Given Frequencies
2000-01-01 Bertazzi, L.; Speranza, M. G.; Ukovich, Walter
Decentralized control of continuous-time production-distribution systems with unknown inputs
2000-01-01 Blanchini, F.; Miani, S.; Ukovich, Walter
Evaluating the performance of an airport landside using DEA
2000-01-01 Castelli, Lorenzo; R., Pesenti; Ukovich, Walter
Periodic Scheduling for Manufacturing. A Two Stage Approach for MPS Selection
2000-01-01 P., Persi; R., Pesenti; Ukovich, Walter; Nicolich, Marino
An algorithm for linearly constrained piecewise lexicographic programming
2001-01-01 Pastore, Stefano; Premoli, Amedeo; Ukovich, Walter
Discrete frequency models for inventory management
2001-01-01 Favaretto, D.; Pesenti, R.; Ukovich, Walter
Two Job Cyclic Scheduling with Incompatibility Constraints
2001-01-01 Pesenti, R.; Persi, P.; Ukovich, Walter
An Algorithm for Linearly Constrained Piecewise Lexicographic Programming Problems
2001-01-01 Pastore, Stefano; Premoli, A.; Ukovich, Walter
Legenda icone
- file ad accesso aperto
- file disponibili sulla rete interna
- file disponibili agli utenti autorizzati
- file disponibili solo agli amministratori
- file sotto embargo
- nessun file disponibile