The paper deals with the problem of improving the machine utilization of a flexible manufacturing cell. Limited tool magazine space of the machines turns out to be a relevant bottleneck. A hierarchic approach for this problem is proposed. At the upper level, sets of parts that can be concurrently processed (batches) are determined. At lower level, batches are sequenced, linked and scheduled. Methods taken from the literature are used for the solution of the latter subproblems, and an original mixed integer programming model is formulated to determine batches. The proposed methods are discussed on the basis of computational experience carried out on real instances.
A Hierarchic Approach to Production Planning and Scheduling of a Flexible Manufacturing System
UKOVICH, WALTER;NICOLICH, MARINO
1999-01-01
Abstract
The paper deals with the problem of improving the machine utilization of a flexible manufacturing cell. Limited tool magazine space of the machines turns out to be a relevant bottleneck. A hierarchic approach for this problem is proposed. At the upper level, sets of parts that can be concurrently processed (batches) are determined. At lower level, batches are sequenced, linked and scheduled. Methods taken from the literature are used for the solution of the latter subproblems, and an original mixed integer programming model is formulated to determine batches. The proposed methods are discussed on the basis of computational experience carried out on real instances.Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.