Projects are well-known context of uncertainty and project managers have to deal with it in the face of other issues as productivity, efficiency, limited financial and human resource, time schedule etc. Previous studies and practices have proposed risk management models that include identification and assessment of risks and measures to control them, but in several cases the complexity of the model and the amount of data to feed it make its actual implementation difficult. The aim of the study here presented is to provide a feasible framework that can support risk acceptance on the basis of the identification and assessment of risks in an actual project management context. Accepting a risk can be counted as a strength of seizing new opportunities from uncertainty. The model, which the framework produces, can be designed and optimized step-by-step. Initially, the model is designed with a five-step DRIVE procedure, then it is reviewed and optimized by a DMAIK procedure. The proposed framework supports the building of a flexible and a practical model, which is efficient and effective for risk management in projects and can create new opportunities for a company by accepting the risk.

Prepare Organizations to Accept Risks: A Feasible Risk Management Model

AGHAZADEH ARDEBILI, ALI
;
Elio Padoano;
2017-01-01

Abstract

Projects are well-known context of uncertainty and project managers have to deal with it in the face of other issues as productivity, efficiency, limited financial and human resource, time schedule etc. Previous studies and practices have proposed risk management models that include identification and assessment of risks and measures to control them, but in several cases the complexity of the model and the amount of data to feed it make its actual implementation difficult. The aim of the study here presented is to provide a feasible framework that can support risk acceptance on the basis of the identification and assessment of risks in an actual project management context. Accepting a risk can be counted as a strength of seizing new opportunities from uncertainty. The model, which the framework produces, can be designed and optimized step-by-step. Initially, the model is designed with a five-step DRIVE procedure, then it is reviewed and optimized by a DMAIK procedure. The proposed framework supports the building of a flexible and a practical model, which is efficient and effective for risk management in projects and can create new opportunities for a company by accepting the risk.
2017
978-3-946856-01-6
File in questo prodotto:
File Dimensione Formato  
cover+toc+paper.pdf

Accesso chiuso

Tipologia: Documento in Versione Editoriale
Licenza: Digital Rights Management non definito
Dimensione 585.59 kB
Formato Adobe PDF
585.59 kB Adobe PDF   Visualizza/Apri   Richiedi una copia
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11368/2913524
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact