MEDEOSSI, GIORGIO
MEDEOSSI, GIORGIO
Dipartimento di Ingegneria e Architettura
Settore ICAR/05 - Trasporti
A method for using stochastic blocking times to improve timetable planning
2011-01-01 de FABRIS, Stefano; Longo, Giovanni; Medeossi, Giorgio
An algorithm for the calibration of running time calculation on the basis of GPS data
2011-01-01 de FABRIS, Stefano; Longo, Giovanni; Medeossi, Giorgio
An approach for Calibrating and Validating the Simulation of complex rail networks 
2013-01-01 Longo, Giovanni; Medeossi, Giorgio
Application and validation of a timetabling algorithm to a large Italian network
2013-01-01 de FABRIS, Stefano; Longo, Giovanni; Medeossi, Giorgio; Pesenti, Raffaele
Automated analysis of train event recorder data to improve railway simulation
2008-01-01 de FABRIS, Stefano; Longo, Giovanni; Medeossi, Giorgio
Automated analysis of train event recorder data to improve railway simulation
2010-01-01 de FABRIS, Stefano; Longo, Giovanni; Medeossi, Giorgio
Automatic generation of railway timetables based on a mesoscopic infrastructure model
2014-01-01 de FABRIS, Stefano; Longo, Giovanni; Medeossi, Giorgio; Pesenti, Raffaele
Capacity vs Reliability in railways: A stochastic micro-simulation approach
2012-01-01 Longo, Giovanni; Medeossi, Giorgio
COMPARISON BETWEEN ANALYTICAL AND SIMULATION APPROACH FOR TERMINAL FLOW ESTIMATION
2012-01-01 Giacomini, Cristian; Longo, Giovanni; Medeossi, Giorgio
Coping with extremely variable train delay on a complex railway junction: lesson learned from Beograd case study
2010-01-01 Longo, Giovanni; Medeossi, Giorgio; Milanovic, Z.
Designing a car-sharing service for small cities
2013-01-01 Geremia, G.; Longo, Giovanni; Medeossi, Giorgio
Enhancing timetable planning with stochastic dwell time modelling
2012-01-01 Longo, Giovanni; Medeossi, Giorgio
Entwicklung eines Modells zur Analyse einer Kooperationmoeglichkeit zwischen konkurrierenden Verkehrsinfrastrukturen
2011-01-01 Cavallaro, F.; Longo, Giovanni; Medeossi, Giorgio; Nocera, S.; Wagner, M.
Estimating train motion using detailed sensor data
2012-01-01 Longo, Giovanni; Medeossi, Giorgio; Nash, A.
Multi-criteria Analysis to Support Mobility Management at a University Campus
2015-01-01 Longo, Giovanni; Medeossi, Giorgio; Padoano, Elio
Nuove metodologie per l’incremento di capacità di reti ferroviarie nelle aree metropolitane
2007-01-01 Longo, Giovanni; Luthi, M.; Medeossi, Giorgio; Weidmann, U.
Rescheduling and Train Control: A New Framework for Railroad Traffic Control in Heavily Used Networks
2007-01-01 Luethi, M.; Weidmann, U.; Laube, F.; Medeossi, Giorgio
Robustness and delay reduction of advanced train dispatching solutions under disturbances
2010-01-01 Corman, F.; D'Ariano, A.; Longo, Giovanni; Medeossi, Giorgio
Stochastic micro-simulation as a timetable robustness estimation tool
2009-01-01 Huerlimann, D.; Longo, Giovanni; Medeossi, Giorgio
Structure and Simulation Evaluation of an Integrated Real-Time Rescheduling System for Railway Networks
2009-01-01 Luethi, M.; Medeossi, Giorgio; Nash, A.