This paper investigates the economical feasibility of four-phase (4P) overhead transmission lines, considered as a possible alternative to the traditional three-phase (3P) connections. The paper performs an economical comparison between innovative 4P transmission lines and traditional 3P lines, with the goal of evaluating the contests where a 4P connection could become convenient, accounting for different reliability, land occupation, visual impact, energy losses and investment costs.

4-Phase AC Connections: an Alternative Possibility for the Expansion of Transmission Grids

QUAIA, STEFANO;
2010-01-01

Abstract

This paper investigates the economical feasibility of four-phase (4P) overhead transmission lines, considered as a possible alternative to the traditional three-phase (3P) connections. The paper performs an economical comparison between innovative 4P transmission lines and traditional 3P lines, with the goal of evaluating the contests where a 4P connection could become convenient, accounting for different reliability, land occupation, visual impact, energy losses and investment costs.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11368/2295917
 Avviso

Registrazione in corso di verifica.
La registrazione di questo prodotto non è ancora stata validata in ArTS.

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 21
  • ???jsp.display-item.citation.isi??? 9
social impact